Home / Playbooks / Deconstruct Legacy Monolith Netsuite Sprints
Playbook 05

Modular Legacy Deprecation: Deconstructing On-Prem Monoliths in 7 Two-Week Sprints

Avoid $1M+ Big-Bang ERP failures. Learn how DataOngoing retired a 15-year legacy manufacturing system in 7 modular sprints with zero plant downtime.
Traditional Big-Bang Overhaul18 Months ($1.2M - $1.5M T&M)
DataOngoing Modular Delivery7 Months (7 Two-Week Sprints, $255k Fixed)
Capital Preserved$944,000+ (78% Cost Reduction)
Manufacturing DowntimeExactly Zero Hours

The Hostage Scenario: 15 Years on an On-Premise Monolith

In mid-market manufacturing, mission-critical operations are frequently held hostage by aging on-premise systems: custom Microsoft Access databases, legacy client-server tools, and brittle local file servers.

At a premier aerospace and semiconductor filtration manufacturer, 45 metallurgical engineers and shop-floor machinists relied daily on a 15-year-old on-premise system known as "Pulse":

When global consultancies were invited to bid on modernizing the plant, the proposals were shocking: $1,200,000 to $1,500,000, an 18-month timeline, and required plant shutdowns during cutover.

Leadership rejected the proposals. They could not risk halting aerospace deliveries.


The Speed-to-Market Solution: The Strangler Fig Pattern

DataOngoing proposed a radically different architectural model: Modular Legacy Deprecation under a fixed-price investment of $255,520.

Instead of a high-risk "Big-Bang" cutover, we deconstructed the legacy monolith into seven discrete operational domains, delivering working native NetSuite Single Page Applications (SPAs) every two weeks:

[Legacy On-Prem Monolith]
  ├── Sprint 1: Design Change Requests (DCR)        -> Live Suitelet SPA + BOM Revision Sync
  ├── Sprint 2: Manufacturing Quality Scrap (QMS)   -> Real-Time Shop-Floor Defect Logging
  ├── Sprint 3: Governed SharePoint Cloud Vault     -> Azure SSO + Microsoft Graph CAD Bridge
  ├── Sprint 4: Customer Diagnostic Lab (CIC)       -> RMA Queue & Forensic Material Testing
  ├── Sprint 5: Non-Conformance POs (NCEPO)         -> Automated Quality Holds on AP Bills
  ├── Sprint 6: SOX Cryptographic Signatures        -> 21 CFR Part 11 Audit Trail & Multi-Factor
  └── Sprint 7: Powder Metallurgy & Sieve QA        -> Real-Time Particle Distribution Curves

Why Modular Sprints Beat Big-Bang Overhauls:

  1. Zero Plant Interruption: Each module ran in parallel on the shop floor for 14 days before cutting over. The factory never stopped running.
  2. Fixed Financial Accountability: Each sprint was tied to working software deployed in production. Zero open-ended Time & Materials billing.
  3. Sub-Second Modern Frontends: Rather than forcing machinists into slow, native ERP web forms, workflows were built as modern Single Page Applications (SPAs) loading in under 200 milliseconds on rugged shop tablets.

The Outcome

In seven months, the 15-year-old legacy system was completely decommissioned. The legacy server was recycled.

Enterprise modernization does not require gambling the company on a big-bang cutover. Deconstruct the problem, ship working software every fourteen days, and eliminate technical debt systematically.


Explore DataOngoing's modular modernization blueprints at DataOngoing.com.


Source text: markdown version. Oracle and NetSuite are registered trademarks of Oracle Corporation; references are descriptive.

Talk to the architect, not a salesperson

AI automation for private-equity portfolios, measured in basis points: a few hours of operating-partner time in, hundreds of engineering hours and margin out, delivered as working code in two-week sprints.

Get a 72-Hour Diligence Read   Read the 100x Ledger

(844)-991-3648  •  2doai@dataongoing.com